Project Information
- Status Completed
- Location Sremska Raca, Sırbistan
- Year 04.09.2021
- Client Sırbistan Yapı Ulaştırma ve Altyapı Bakanlığı-“Roads of Serbia”
Contact Us
Scope of Work
Construction of in-water river piers for the river crossing bridge over the Sava River.
- Construction of 56 pcs Ø1500 mm bored piles using polymer drill slurry.
- Construction and removal of temporary cofferdam structures of 700 m² per river pier, including 1,000 tons of steel fabrication.
- Total 12,800 m³ concrete pouring and 1,550 tons of rebar fabrication.