Scope of Work
KYK-1 piled road bridge:
- Driving of 153 pcs Ø914.4 mm, t=12 mm steel pipe piles (2,100 tons)
- Drilling of 153 pcs Ø914.4 mm, t=12 mm steel pipe piles (8,600 m)
- KYK-2 piled road bridge:
- Driving of 540 pcs Ø914.4 mm, t=12 mm steel pipe piles (7,640 tons)
- Drilling of 540 pcs Ø914.4 mm, t=12 mm steel pipe piles (31,400 m)
- KYK-3 piled road bridge:
- Driving of 121 pcs Ø914.4 mm, t=12 mm steel pipe piles (950 tons)
- Drilling of 121 pcs Ø914.4 mm, t=12 mm steel pipe piles (4,150 m)