Scope of Work

*Total 10,000 meters of pile driving Ø1625.6 mm, Ø1524 mm and Ø1422.4 mm (275 pcs)

*Rock drilling of steel pipe piles with RCD (Wirth PBA) equipment and 4 m rock socketing of steel piles (total 11,000 m drilling)

*Pouring of more than 15,000 m³ concrete within the scope of superstructure works

*More than 5,000 m³ precast installation works

*Construction of a total of 6 dolphins and 1 loading/unloading platform

*Construction of a total of 1,000 m approach road

*Installation of port accessories (quick release hooks, fenders, etc.)