Ceyhan West (Old) Jetty
 Strengthening, Extension and Breakwater Construction Project

Ceyhan West (Old) Jetty

Strengthening, Extension and Breakwater Construction Project

Extension and Breakwater Construction Project

Project Gallery

Project Information

  • Status Completed
  • Location Ceyhan, Adana, Türkiye
  • Year 20.10.2022
  • Client Toros Tarım Sanayi ve Ticaret A.Ş.

Contact Us

Scope of Work

Driving of 126 pcs Ø762 mm/16 mm steel pipe piles

  • Driving of 18 pcs Ø812.8 mm/12 mm steel pipe piles
  • Driving of 120 pcs Ø1422.4 mm/22 mm steel pipe piles
  • Driving of 198 pcs Ø1524 mm/22 mm steel pipe piles
  • Driving of 1 pc Ø2200 mm/32 mm steel pipe pile
  • Pile dynamic capacity testing (PDA test)
  • Reinforced concrete superstructure works for the tugboat jetty
  • Reinforced concrete superstructure works for the 80,000 DWT platform
  • Reinforced concrete superstructure works for Loop 3 and Loop 4
  • Reinforced concrete superstructure works for mooring dolphins
  • Structural steel works
  • Precast works for the access road
  • Structural steel works for the approach road and pipe gallery
  • Demolition of the existing platform
  • Strengthening and modification of the liquid dolphin
  • Breakwater and crown wall construction
  • Installation of port accessories