1915 Canakkale Bridge
 Wet Dock and Logistics Jetties

1915 Canakkale Bridge

Wet Dock and Logistics Jetties

Project Gallery

Project Information

  • Status Completed
  • Location Çanakkale, Türkiye
  • Year 10 Ocak 2019
  • Client ÇOKİYİ A.Ş.

Contact Us

Scope of Work

Construction of the access bridge and 4 berthing dolphins:

  • Driving of 139 pcs Ø1600 mm, t=25 mm steel pipe piles with lengths between 34 m and 52.50 m
  • 15 pile dynamic analysis (PDA) tests on steel pipe piles
  • Fabrication and installation of 1,050 tons of superstructure steel comprising HEB1000/HEB340/HEB300/HEB200 profiles and plates of various thicknesses
  • Production and installation of 190 precast reinforced concrete slabs
  • 2,772 m³ concrete pouring
  • 400 tons rebar installation
  • 3,684 pcs Ø19/300 mm stud welding
  • 55,262 pcs Ø19/150 mm stud welding
  • Installation of 20 fenders
  • Supply and installation of 11 pcs 35 t/50 t bollards
  • Installation of 32 pcs mooring/berthing winches, sheaves, swivel heads and wire stoppers